← Dashboard
Edit Week 2 — Oct 2 – Oct 6 (Pre‑Op W2)
Last saved: 2025-10-07 08:42
Note
Oct 2: Changed the name of the website to ReKover, and propagated that change all throughout the pages in the domain. Then created a subdomain on GoHW.net, rekover.gohw.net, and I'm waiting on that to propagate DNS before I can create a forwarding instruction at DNS to send recover.gohw.net references to gohw.net/Rekover.html Took a call from Piedmont hospital a nurse there his name is in my chart. Call was about surgery coming up next Tuesday and preparing. A letter with details is in my chart. Short term disability calls: AutoOwners: fail except changing semi-annual payment to monthly. Payment down to 440 from 2400 due. No financial assistance available. Followed up with Garrison the insurance broker: expecting to get a call back from Gregory tomorrow to discuss coverage reductions to help premium reduction. Noted some fasciculations (twitches) in the legs today and noted research on it - in OneNote Short-term disability: Federal can kick in only after a year, meant for more long-term disability. Nothing exists for Georgia, no State run short-term disability program. Mr Cooper mortgage: chat and phone call finally led to an email that's supposed to come: they will processing and be in touch. Loan modification was brought up in chat and I asked if there was a less invasive way which is how I got to the phone call via number they gave me. 8884802432 (also exposes as to a higher interest rate I believe) Mortgage is still due Oct 16th for now and I don't suspect this will change. Also looked at Heloc and Home Equity Loans Oct 3 Design effort start with Paul Wrights in Brookhaven (Tina drove and helped me measure) Worked some more on the Georgia Access Health Insurance application process - waiting on call back from Robert Brown, the accountant. Researched and documented (in OneNote) pool metal staining root causes and relationship to phosphate treatments. Developed several solution options. Worked that until had plan to solve and product required Created the OneNote project folders for both Jennifer and Brian Harcourt as well as Paul Wrights, and Shared the OneNote with the clients Oct 4 Received pool incoming water metal filter system. Had to rebuild The awful instruction manually it came with. During process I discovered I can use the same Fillfast system to clean the entire pool water contents. So spent time on what that would look like and how it would perform vs one of culator's simpler products you just drop in the pump reservoir. Documented those results in OneNote. Action needed on above is rental of an electric pump to start the pool water cleanup. The thinking now is that this will use a set of two of the fill fast filters and the remaining two set filter system will be used ongoing for incoming water supply. Updated both design clients OneNotes (Harcourt and Wright) to include current contracts and photos and the site measurement and sketches Oct 5 Pool metals: received flow sensor and metal testing strips. Looked at pump need based on filter flow rate reqmt, and found what needed at home depot. Also need ball valve for flow control and maybe jumper hoses... Drew a diagram to capture need for adapters and jumper hoses - Documented in OneNote Tina grabbed the pump, adapter, and jumper hose For Jennifer and Brian Harcourt client: Created The as built conditions in chief architect, for the up call bath and the first floor. Also created first concept for the proposed hall bath Oct 6 Tweaked the Harcourt up hall bath design. Found an error in the Harcourt As built condition. Need to visit the site for new dimensions Went to pre-op with Tina and visited the hospital location Measured at the Harcourt's again and reconciled the as built condition and completed the full as built condition for both floors. Created concept for 1st floor changes, created render views for later showing to client and documented in OneNote
Save
Prev
Next