← Dashboard
Edit Week 19 — Jan 26 – Feb 1 (W17)
Last saved: 2026-02-01 18:10
Note
Jan 26 Near total focus on a Web based JavaScript page that distills in depth industry standard mural data and renders that in a user interface that let's users select from many attributes and from that it compiles a detailed mural description in either technical or poetic form. Phase 3 is implementing API for custom image generation from that as a final output. Jan 27 Spoke with KL about doing a mural measure and drawing for Anna/Sydney in Lookout Mountain Tenn. Spoke with Anna about it also. Going in the morning early. 3 hours on the bike. Right calf in a knot. Electrolytes, fuel, and Epsom salts and hot bath followed by cryotherapy Played harmonica with Lana and Dean playing banjo and spoons Jan 28 Try to look out mountain Tennessee to measure for a dining room mural for a miss Anna Stewart of a.m. interiors. Drove home and first thing did my shoulder work having Tina help me stretch it out. around 6:00 started on the drawing and Chief architect. Room was pretty much from scratch had a quite a few things going on in it. It had a box window which I never done in Chief architect. So anyway I took about 4 and 1/2 hours on it all a while thinking about how that would be so disappointing to KL, that is, definitely not meeting his approval. What regardless the room was modeled accurately and the drawing looks great and it's correct. I went ahead and texted the link to KL and to Anna Stewart. No riding today. Letting My calf muscle heal. Jan 29 Sid shoulder stretching 1hr:30 on bike, z2 sufferfest Jan 30 Did a foyer for Valerie with Dustin Did a 2hr strict z1)2, all z1, saw Lamar olin SMP Jan 31 Shoulder work, no cryotherapy these days Rode bike 65 minutes doing z5 and z4 Created custom AI murall art, massaged and installed into a room using chief architect. Next step is to divide into normal panel size and print to confirm art/file quality. Otherwise if not, post-processing needed to make it printable and high enough resolution for real world install Feb 1 Sent invoice to Valerie Garrett it was a foyer done on this past Friday. Did an hour and 55 minute ride, Z2 steady
Save
Prev
Next